Langage Energy Park — live case study
Adoptable highways, drainage and earthworks delivered through a carefully phased S278 and S38 infrastructure programme.
Unit 4 Phase 1 Extension
The complete substructure and superstructure package for an extension that creates additional operational space.
Glenholt Sewage Pumping Station — Storm Tank & Rising Main Upgrade
A storm tank and rising main upgrade strengthening the network’s stormwater resilience and operational capacity.
Mid Devon Waste Transfer Station — Drainage Installation Case Study
Early drainage works at a live waste transfer facility, from new chambers and pipework to specialist tanks and separators.
A record of what lasts.
Completed project profiles are not yet published in the source archive. We won't present ongoing work as finished or invent case studies to fill the space.
In the meantime, the live project reports above show the engineering, coordination and care behind each stage of delivery.