Langage Energy Park — live case study

Adoptable highways, drainage and earthworks delivered through a carefully phased S278 and S38 infrastructure programme.
Unit 4 Phase 1 Extension

The complete substructure and superstructure package for an extension that creates additional operational space.
Glenholt Sewage Pumping Station — Storm Tank & Rising Main Upgrade

A storm tank and rising main upgrade strengthening the network’s stormwater resilience and operational capacity.
Mid Devon Waste Transfer Station — Drainage Installation Case Study

Early drainage works at a live waste transfer facility, from new chambers and pipework to specialist tanks and separators.